Background
Participants are provided with a training manual containing description, drawing and circuit diagrams on aircraft ground handling, systems and power plant installation. Explaining their function, operation and location in a general or detailed manner as considered necessary for power plant and airframe engineers. The information is compiled in accordance with ATA Specification 100.
Objective
The training is designed to provided skilled and experienced aircraft maintenance personnel with the necessary theory practical know-how to carry out line maintenance and periodic checks in accordance with the approved Cassa 212 Maintenance schedule and associated manuals to perform trouble shooting and snag rectification. The course contents are adapted to the latest standard.
Who Should Attend
Engineer Cassa 212 Licence Holder
Venue
Pelita Air Training Center Bandar Udara Pondok Cabe Jl. Pondok Cabe Raya Pamulang – Tangerang Selatan
Duration
Initial Training : 5 Days
Licence Validity
1 Years